Construction of a Prefabricated Modular Building for a Thermal Disinfection and Decontamination Station for Pathogenicity Groups III–IV Effluents

16.06.2022

Customer: VIPS-MED

INEX specialists were invited by VIPS-MED to participate in the construction project of the FGBI ARRIAH Information Computing Center in Vladimir. In accordance with the terms of reference of the facility: the project provides for the placement of the following buildings and structures: Information and Computing Center of the FGBI “ARRIAH” ITC; TP 3/2 (transformer substation); DGU No. 1 (stationary); DGU No. 2 (mobile, on a wheeled chassis) and a number of special equipment for clean rooms. The main part of the work of the INEX Company was the project to ensure the operation of the information and computing center: installation and configuration of automation system components and related services that ensure fault tolerance, reliability and uninterrupted operation of the FSIS VetIS software, as well as installation and configuration of server and switching equipment. INEX Company specialists completed the following sections of the project: • TV. Terrestrial television • LAN. Local computing network • APU. System of subscriber intercoms • ATS. Automatic telephone system • ASDU. Automatic supervisory control system • ESS. Outdoor power supply. • NSS. Intra-site communication networks. • EOM. Power supply and electric lighting • SCS. Structured cabling systems • KSB. Integrated security system. (SVN, ACS, SOS, Black Sea Fleet • LAN. Local computing network • APU. System of subscriber intercoms • ATS. Automatic telephone system • APS. Automatic fire alarm system. • SOUE. Warning system and management of evacuation of people in case of fire. All components of the project have been put into operation, a conclusion on compliance has been received.